Introduction. There have been changes throughout the entire 2023 NEC that may affect the installation of photovoltaic (PV) systems. However, this article will concentrate on the changes in Article 690, Solar Photovoltaic (PV) Systems, Article 705, Interconnected Power Production Sources, Article 691, Large-Scale Photovoltaic (PV) Electric Supply Stations, and Article 710, Stand-Alone Systems, that more directly affect PV systems. These articles are under the purview of Code-Making Panel No. 4, chaired by James J. Rogers.
Unfortunately, the definition of Stationary Standby Batteries as batteries remaining in a float charge or near 100 percent state of charge awaiting a discharge event also appears to be applicable to energy storage system batteries. Most PV systems with energy storage systems are utility-interactive, and the batteries remain in the fully charged state until there is a utility outage, sometimes at infrequent intervals or never. The two articles may overlap and be applied in a single system. Here is an example.
The text of the 2023 NEC changes will not be fully addressed because of the limitations on the length of this article. The full text of the 2023 NEC is available for viewing on the NFPA website at NFPA
Section 690.1, Scope. Informational Notes, Figures 690.1(a) and (b) have been combined into one figure Informational Note, Figure 690.1. This revision adds some clarity by eliminating the interconnections to energy storage systems and showing only the DC PV circuits.
Section 690.4(B), General Requirements. Additional equipment and acronyms have been added to the list of equipment that must be listed or have a field inspection label applied.
Section 690.4(G), PV Equipment Floating on Bodies of Water. This new section dealing with equipment floating on bodies of water has been added. The section adds additional requirements over those requirements for fixed, land-based PV installations.
Section 690.7(D), Marking DC PV Circuits, has been added dealing with the marking requirements for DC PV circuits. The highest maximum DC voltage in the system must be provided by the installer in one of three listed locations.
Section 690.8(1)(b), Photovoltaic Output Circuit Currents, has been eliminated and the subsequent paragraphs renumbered with some combining of requirements. An Informational Note has been added to indicate that modules that can produce electricity when exposed to light on multiple surfaces are labeled with additional information.
Section 690.8(D), Sizing of Module Interconnection Conductors, has had the name changed to Multiple PV String Circuits and has been divided into subparagraphs for additional clarity.
Section 690.9(D), Power Transformers, has had the name changed to Transformers and the current text has been shortened and points to the requirement in Section 705.30 (F). The Exception remains the same.
In Section 690.12, Rapid Shutdown of PV Systems on Buildings, Exception Number 2 has been added dealing with non-enclosed detached structures not requiring rapid shutdown systems.
Section 690.12(A), Controlled Conductors, has a new Exception dealing with arrays not attached to buildings that terminate on the exterior buildings and PV system circuits installed in accordance with 230.6. These circuits are excepted from the rapid shutdown requirement.
Section 690.12(B), Controlled Limits, has an additional sentence that says that equipment and systems shall be permitted to meet the requirements both inside and outside the array as defined by the manufacturer''s instructions, including in the listing.
The contents of Section 690.12(D), Equipment, have been removed and replaced with marking requirements previously found in Section 690.56(C) and retain the title of that section, Buildings with Rapid Shutdown. The requirements for marking and been slightly changed, and the Informational Note now refers to Figure 690.12(D).
In Part III. Disconnecting Means, Section 690.13 has had (A) Location, broken down into two subparagraphs, (1) Readily Accessible and (2) Enclosures and Doors and Covers. This is essentially a rewrite of the existing requirement that was found in one paragraph.
Section 690.15(A), Location, has been replaced with a new section entitled Type of Disconnecting Means, which has three subparagraphs elaborating on the types of disconnecting means.
Section 690.15(C), Equipment Disconnecting Means, has been revised into four subparagraphs essentially containing the same contents as the previous single paragraph.
About 600 kWh photovoltaic energy storage system
As the photovoltaic (PV) industry continues to evolve, advancements in 600 kWh photovoltaic energy storage system have become critical to optimizing the utilization of renewable energy sources. From innovative battery technologies to intelligent energy management systems, these solutions are transforming the way we store and distribute solar-generated electricity.
When you're looking for the latest and most efficient 600 kWh photovoltaic energy storage system for your PV project, our website offers a comprehensive selection of cutting-edge products designed to meet your specific requirements. Whether you're a renewable energy developer, utility company, or commercial enterprise looking to reduce your carbon footprint, we have the solutions to help you harness the full potential of solar energy.
By interacting with our online customer service, you'll gain a deep understanding of the various 600 kWh photovoltaic energy storage system featured in our extensive catalog, such as high-efficiency storage batteries and intelligent energy management systems, and how they work together to provide a stable and reliable power supply for your PV projects.
Related Contents